PC / CB / STS Classes
Open & Closed Transition
IEC 60947-6-1
Certifications et qualité
IEC 60947-6-1
IEC 61439
ISO 9001
Factory FAT
Applications typiques
Marchés desservis
Middle East
Africa
Southeast Asia
Latin America
Périmètre technique
ATS ClassPC / CB / STS
TransferOpen / Closed Transition
Voltage400V / 690V · 3P / 4P
StandardIEC 60947-6-1 · IEC 61439
Capacités d’ingénierie
- ATS logic design and transfer sequence engineering
- Mechanical/electrical interlock configuration
- Factory functional testing before shipment
- Controller integration with generator and remote monitoring
Processus ingénierie et livraison
1
Classification charges
2
Logique transfert
3
Essai fonctionnel usine
4
Support réception site
Projets de référence
Questions fréquentes
What is the difference between PC and CB class ATS?
PC class uses contactors for smaller loads; CB class uses molded case breakers for higher capacity and fault levels.
How fast can ATS transfer occur?
Critical applications typically require 10–15 second transfer after mains failure.
Différence PC et CB ?
PC avec contacteurs ; CB avec disjoncteurs pour fort courant.
Délai de transfert ?
Applications critiques : typiquement 10–15 s après coupure réseau.
Besoin d’une ingénierie switchgear sur mesure ?
Envoyez SLD, liste de charges ou plan — réponse ingénierie sous 24 h.
Ressources techniques
Consultez fiches et certificats, ou soumettez votre SLD pour revue.
Contacter un ingénieurParcourir les produits switchgear
Filtres
Classe ATS
Type de transfert
Régulateur
Tension
Armoire ATS from iNNOVA — China factory direct supply of HV/LV switchgear, ATS and paralleling panels with IEC certification, custom engineering support and global delivery. Browse specifications and request quotation online.