📞 +86-13248076730 ✉️ info@innovaeme.com 🕐 Lun–ven 9 h–18 h (GMT+8)
Groupes électrogènes et pièces Cummins / Perkins / Weichai expédiés dans plus de 120 pays
À propos Actualités |

Industrial & Mining Power Solutions

Heavy-duty prime and standby power for mining, manufacturing and remote industrial operations.

1000–2000kW Heavy-Duty 6kV/11kV High Voltage Parallel Expansion Ready
Industrial & Mining Power Solutions

Défis sectoriels courants

Heavy Load Demand

Mining and industrial sites require megawatt-scale reliable power.

High Voltage Distribution

6kV/11kV systems reduce losses over long distances.

Scalable Capacity

Projects need modular expansion as load grows.

Harsh Conditions

Dust, heat and remote locations demand rugged engineering.

Atouts ingénierie

1000–2000kW Heavy-Duty

6kV/11kV High Voltage

Parallel Expansion Ready

Harsh Environment Design

EPC Integration Support

Factory FAT Testing

Architecture d’infrastructure électrique

Une solution fiable intègre groupes, ATS, switchgear, synchronisation, carburant et monitoring — pas des groupes isolés.

  • Groupes électrogènes
  • Transfert automatique ATS
  • Systèmes parallèles
  • Distribution électrique
  • Gestion carburant
  • Télésurveillance
Architecture d’infrastructure électrique

Questions fréquentes

When is high-voltage generation required?

Mining and large industrial sites often use 6kV/11kV to reduce cable losses over long distances.

Can multiple generators operate in parallel?

Yes. iNNOVA provides paralleling switchgear and synchronization control for load sharing and N+1 redundancy.

Prêt à construire votre solution ?

Indiquez charge, tension et redondance pour une proposition personnalisée.