PC / CB / STS Classes
Open & Closed Transition
IEC 60947-6-1
Certifications & Quality
IEC 60947-6-1
IEC 61439
ISO 9001
Factory FAT
Typical Applications
Global Markets Served
Middle East
Africa
Southeast Asia
Latin America
Technical Scope
ATS ClassPC / CB / STS
TransferOpen / Closed Transition
Voltage400V / 690V Β· 3P / 4P
StandardIEC 60947-6-1 Β· IEC 61439
Engineering Capabilities
- ATS logic design and transfer sequence engineering
- Mechanical/electrical interlock configuration
- Factory functional testing before shipment
- Controller integration with generator and remote monitoring
Engineering & Delivery Process
1
Load Classification
2
Transfer Logic Design
3
Factory Functional Test
4
Site Acceptance Support
Reference Projects
Frequently Asked Questions
What is the difference between PC and CB class ATS?
PC class uses contactors for smaller loads; CB class uses molded case breakers for higher capacity and fault levels.
How fast can ATS transfer occur?
Critical applications typically require 10β15 second transfer after mains failure.
Need Custom Switchgear Engineering?
Submit your SLD, load list or project layout β our engineers respond within 24 hours.
Technical Resources
Browse datasheets and certificates, or submit your SLD for engineering review.
Contact EngineerBrowse Switchgear Products
Filters
ATS Class
Transfer Type
Controller
Voltage
ATS from iNNOVA β China factory direct supply of HV/LV switchgear, ATS and paralleling panels with IEC certification, custom engineering support and global delivery. Browse specifications and request quotation online.